Custom Quote
Home / How Quality Is Controlled on Ceramic Planters
Quality

How Quality Is Controlled on Ceramic Planters

Ceramics fail in ways that are invisible until the carton is opened: a hairline crack from a fast cool, a glaze that crazes after a winter outdoors, a shade that drifts between kiln loads. This page sets out where those failures are caught, and what the acceptance standards actually are.

3 Inspection gates per order
AQL 2.5 Major defect acceptance level
1.2 m Drop height for packed cartons
72 h Burn-in on electronics lots

Three Gates, Not One Final Check

A single inspection before loading finds problems after they have already been paid for in labour, glaze and kiln time. The factory works to three gates so that defects are caught while they are still cheap to fix.

Gate 1 — Incoming material

Clay body, glaze raw materials and packaging are checked against retained standards on arrival. Moisture content in the body and particle size in the glaze are the two variables that cause most downstream defects.

  • Clay moisture within the agreed band
  • Glaze specific gravity and sieve residue
  • Carton board grade and print against proof

Gate 2 — In-process

First-off approval on every mould and every colour change, then patrol checks through the shift. This is where warping, mould wear and glaze thickness drift are caught before a full kiln load is committed.

  • First-off signed against the master sample
  • Wall thickness and weight checked hourly
  • Glaze coat weight checked per batch

Gate 3 — Pre-shipment

AQL sampling on the finished, packed order. Cartons are opened at random, pieces are inspected on all visible surfaces, and the packing itself is checked because most transit breakage is a packing failure, not a pottery failure.

  • ISO 2859-1 sampling, AQL 2.5 / 4.0
  • Drop test on the packed carton
  • Carton marking and label check

What Is Actually Inspected on a Fired Body

CheckMethodAcceptance
Glaze defects (pinholes, crawling, blistering)Visual, 800–1000 lux, arm lengthNo defect visible on the display surface
Colour matchComparison to retained master chipNo perceptible difference in daylight
WarpingFlatness on a granite surface plateGap under 1.5% of the rim diameter
Drainage holeGo / no-go pinPresent, clear, correct diameter
Foot ringVisual and touchFlat, no sharp edge, sits without rocking
CrazingVisual after 24 h in waterNone on food-contact or outdoor ranges
Chips and cracksVisual, all surfacesZero on the display surface

The display surface is defined per shape and written into the purchase order. A pot has one face the customer sees on the shelf and one face against the wall; treating every square centimetre as display grade doubles the reject rate and the price without improving the product.

Tests That Can Be Arranged on Request

These are not run on every order by default, because each one costs money and time. They are quoted as line items when the destination market or the buyer requires them.

TestStandardTypical reason
Lead and cadmium leachingFDA 21 CFR 175.300 / EU 84/500Planters for herbs, or US retail requirements
Cold crack resistanceThermal shock, 0 °C to 60 °C cyclesOutdoor range in a continental climate
Drop test, packedISTA 3A or 1AE-commerce and parcel network shipping
Carton compressionASTM D642Pallet stacking in a warehouse
REACH SVHC screeningEU REACH candidate listEU import documentation
RoHS and battery transportEN 62321 / UN38.3Smart planter electronics
Surface wearTaber abrasion on glazed tileContract and hospitality projects

AQL: How Many Pieces Get Opened

Inspection follows ISO 2859-1 general inspection level II. For an order of 2,000 pieces that means 125 cartons or pieces sampled, with acceptance at AQL 2.5 for major defects and AQL 4.0 for minor ones. Major means the product cannot be sold or will fail in use; minor means it is visible but does not affect function.

Order quantitySample size (level II)Accept at AQL 2.5Reject at
151–280 pcs3223
281–500 pcs5034
501–1,200 pcs8056
1,201–3,200 pcs12578
3,201–10,000 pcs2001011

Third-Party Inspection Is Welcome

Buyers can appoint SGS, Bureau Veritas, TÜV, QIMA or a local inspection company to attend the pre-shipment check. The factory books the slot, prepares the goods in a dedicated area, and provides the packing list and the approved sample for reference.

  • Give at least five working days notice so the goods are complete and packed when the inspector arrives.
  • The inspector works from your specification, not from ours. Send the approved sample photos and the defect criteria with the booking.
  • If the inspection fails, the report becomes the rework list. Nothing ships until the failed points are re-checked and photographed.

Most Breakage Is a Packing Problem

A ceramic pot that survives a pallet but not a parcel network is a packing failure. For e-commerce and dropship orders the carton is designed around the pot, not chosen from a catalogue: moulded pulp or honeycomb inserts hold the rim and the base, the pot never touches the carton wall, and the box is drop tested at 1.2 m on a corner, an edge and a face.

  • Corner and edge drops find weaknesses that a flat drop never reveals.
  • A 5% breakage allowance in a bulk pallet is normal for ceramics; the same rate in a parcel network is not, and is usually a sign of the insert being too thin.
  • Wooden pallets entering the US or EU need ISPM 15 heat treatment. Moulded pulp and corrugated avoid the issue entirely.

Questions Buyers Ask About This

What happens if the pre-shipment inspection fails?

The failed points become a rework list. Sorting and re-glazing where possible, replacement from stock where not. The order is re-inspected on the failed points and photographed before booking, and the delay is absorbed into the shipment schedule rather than pushed onto the buyer.

Is a certain breakage rate normal for ceramic shipments?

For bulk pallet shipments, up to about 5% is accepted in the trade and priced in. For parcel and e-commerce shipments the target is under 1%, achieved through the insert design and a drop-tested carton rather than a thicker box alone.

Can I use my own inspection company?

Yes, and it is encouraged on first orders. Give five working days notice so the goods are complete and packed. The factory provides the packing list, the approved sample and a dedicated area for the inspection.

Do you provide test reports with the shipment?

Where a test has been commissioned, the report is issued against the order and travels with the shipping documents. Routine orders ship with the inspection report and the packing list; leaching, REACH and drop tests are quoted separately because each carries a lab fee.

Related sourcing

Ask for the inspection standard before you order

Tell us the destination market and how the product will be sold. We will confirm which tests apply and what the acceptance criteria should say.

One supplier, one invoice, one container. Sampling in 7–10 days · MOQ from 200 pcs per accessory SKU.

What do you need?

We reply within one business day. No newsletter, no reselling your details.